Skip to Content

Roadway Design Division

Natural Stream Design

 

STANDARD DRAWINGS HOME PAGE

 

DRAINAGE-NATURAL STREAM DESIGN

DRAWING

REVISION DATE

DESCRIPTION

BOULDER CLUSTERS
ROCK VANES
LOG DEFLECTORS
LOG DROPS AND STEP POOLS
BOULDER RIFFLES
CONSTRUCTED RIFFLES
COCONUT FIBER ROLLS AND LIVE SILTATON
LIVE FASCINES AND WILLOW CUTTINGS
BRUSH MATTRESS
LARGE WOODY DEBRIS
VEGETATED RIPRAP AND GABIONS
VEGETATED MSE WALLS
LONGITUDINAL STONE TOE AND ARTICULATED CONCRETE MAT


 


Questions or comments regarding use of these files should be directed to:

For questions or assistance contact

Ali Hangul, PE

Matthew Chandler, PE

Roadway Design Division

Office of Standards and Policy

Roadway Design Division

Office of Standards and Policy

505 Deaderick Street

1300 James K. Polk Building

Nashville, TN  37243-1402

505 Deaderick Street

1300 James K. Polk Building

Nashville, TN  37243-1402

615-741-0840

615-253-8351