Click up-arrow to view document. Most documents
are in Adobe PDF format (Adobe Reader required).

Long-Range Transportation Plan (LRTP)
Note: Due to file size some
documents may take several minutes to
download. |
| |
Proposed Long Range Transportation Plan (LRTP) Amendment - July 29, 2007 |
|
Plan Summary (4.75 MB) |
| |
PlanGo Summary (Four page)
(467 KB) |
|
Challenges and Opportunities Report (17.1 MB) |
|
Goals, Objectives and Policies Report (1.93 MB) |
|
Modal Needs Report (25.5 MB) |
|
Performance Measures Report (2.58 MB) |
|
Financial Plan Report (1.58 MB) |
|
Strategic Investments Program Report (1.96 MB) |
|
Project Evaluation System Report (1.35 MB) |
|
Aviation System Plan Update (6.3 MB) |
|
Bicycle and
Pedestrian Plan (8.81 MB) |
|
Traditionally Underserved Populations
Outreach and Analysis Approach
(5.33 MB) |
| |
|
Printed Materials |
|
TDOT Long-Range Transportation Plan brochure
|
|
Long-Range Transportation
Plan newsletter #1 (Aug 2004) |
|
Long-Range Transportation Plan newsletter
#2 (Nov 2004)
|
|
Transportation facts
|
|
Long-Range Transportation Plan newsletter #3
(March 2005)
|
|
Final comment form summary (as of 2/28/05)
|
| Strategic Investment Corridors |
| |
I40/I81 Corridor Feasibility Study (3.97MB) |
| |
Appendix A: Projects Included in the Existing-plus-Committed Highway
Network for Knoxville, Nashville and Memphis Urban Areas (167 KB) |
| |
Appendix B: Constructibility (2.67 MB) |
| |
Appendix C: Concept Designs for Operational Improvements along I-40
and I-81 (16.7 MB) |
| |
Appendix D: Evaluation Results for Each "Package" and GeographicalArea
(952 KB) |
| |
I40/I81 Corridor Feasibility Study, Project Priorities – A Corridor Plan
(2.5 MB) |