I-40/James
White Parkway/Hall of Fame Drive
A SmartFix Project
Frequently Asked Questions
Q: Since SmartFix accelerates a construction project, how much time
will be saved on the James White Parkway project?
A: We anticipate at least 23 months of construction time will be
eliminated by the accelerated construction process. This time savings
has a major impact on motorists by saving them time and money sitting
in slower traffic and seeking alternate routes.
Q: Will it cost the state any more to do the project using the
SmartFix method?
A: Actually, No. The estimated cost for doing the project the
traditional method or using the SmartFix method is estimated to be
very nearly the same. The reason is that the additional cost of
traffic control and costs associated with risk/accident/safety will
increase the cost of the project were it done the traditional method.
When the costs to motorists are added in for a longer construction
project, we estimate the traditional method would actually cost more
in the long run. Q: How
will I get downtown if the interstate is closed during construction?
A: By constructing Hall of Fame Drive first, access to and from
downtown will be maintained at all times from I-40. The only movement
that will be closed on the interstate will be for traffic traveling
through town. This traffic will be diverted to I-640.
Q: Does the project include improvements for pedestrians and
bicyclists?
A: Yes – for pedestrians, sidewalks will be improved on the City
streets that are impacted by construction. For bicyclists, six foot
bicycle lanes will be built along both sides of Hall of Fame Drive. In
addition, a ten foot greenway will be built along 6th Ave underneath
I-40 that will connect to the existing City of Knoxville greenway
system.
Q: Will this project include improvements to the Broadway/Hall of
Fame Drive intersection near Old North Knoxville at Kenyon Drive?
A: The intersection of Broadway and Hall of Fame Drive is currently
being reviewed as a separate feasibility study. Additional community
meetings will be necessary for this project, and community input will
play a significant role in the final design alternative that is
selected.
Q: Will this project include sound barriers?
A: Yes – Sound barriers will be constructed along the interstate
corridor adjacent to both the Fourth and Gill and Parkridge
communities.
Q: Will this project help the First Creek flooding problems north
of the interstate?
A: Yes – First Creek currently flows in a box culvert under I-40. This
box culvert will be replaced by longer span bridges, thus lowering the
upstream headwater to help control flooding. In addition, the entire
creek has been modeled to ensure that downstream problems are not
created by allowing more flow through the I-40 crossing. Q: If I
want to use alternate transportation in the downtown area during the
construction, what should I do?
A: Knoxville Area Transit’s express services from Halls, Farragut
and Cedar Bluff are alternatives into downtown and UT. Fixed route
bus service is offered on major corridors Monday-Saturday until
midnight, and on Sundays, 10 a.m.-6 p.m. Fare-free trolleys also
serve downtown, the Coliseum area and UT on weekdays, 7 a.m.-6 p.m.
The SmartTrips program offers help with carpools and vanpools, as
well providing information on biking and walking. The SmartFix 40
office at the corner of N. Fifth and N. Sixth Streets is served by
Route 23 Fairmont with a bus stop conveniently located next to the
building. |