Proposed Design
The proposed project from State Route 21 to Cates Landing
Road will be completed in entirety and be composed of two
typical cross-sections. Beginning at the intersection of State
Route 78 and State Route 21 in Tiptonville and continuing for a
length of 0.30± miles, the proposed typical cross-section will
consist of two 12’ travel lanes, a 12’ continuous left turn
lane, and 4’ shoulders with a curb and gutter closed drainage
system, on a minimum 68’ right-of-way. This minimizes the impact
on local businesses and historic sites located in Tiptonville. Alternatives considered for the project include the above Build Alternative and a No-Build Alternative. |





