Project Update:

There was a public meeting held on March 15, 2012.

Documents related to the meeting are posted below.


Project Summary

TDOT proposes to widen SR-32 (US-321) from SR-73 in Cosby to Wilton Springs Road in Cocke County, Tennessee. The proposed project would widen the existing two-lane roadway to four lanes. The total project length is approximately 6.5 miles.

From SR-73 to just north of Orchard Road, TDOT proposes widening SR-32 to a four-lane roadway divided by a 48-foot median with 12 foot shoulders. From just north of Orchard Road to Wilton Springs Road, TDOT proposes widening SR-32 to four 12-foot lanes with a continuous 12-foot center turn lane with 8-foot shoulders. Some of the improvements would occur on new location.

The proposed project would cross the Foothills Parkway, which is administered by the National Park Service (NPS). As currently proposed, the project would cross the Foothills Parkway east of the existing SR-32/Foothills Parkway intersection, on NPS land, and would result in the realignment of the current Foothills Parkway in this area.

Project Library

   Public Meeting Documents - March 15, 2012