From Troy-Polk Station Road to SR-3 (US 51), Union City, Obion County
Project Description
TDOT has separated the State Route 5 (US 45W) project in Obion County into two sections. Section 1 starts at Troy-Polk Station Road and ends near Allie Campbell Road (6.61 miles), and Section 2 starts near Allie Campbell Road and ends at the State Route 3 (US 51) and Walker Tanner Road intersection in Union City (2.7 miles). It is proposed to widen SR-5 from Troy-Polk Station Road to SR-3 from a two-lane highway into a four-lane, divided highway.
Click here
to view a location map for SR-5 (US 45W) from Troy Polk Station Road to near Allie Campbell Road (Section 1).
Click here
to view a location map for SR-5 (US 45W) from near Allie Campbell Road to SR-3 (US 51) in Union City (Section 2).

Photo of existing State Route 5 in Obion County.

Example of a route with a similar design.